Skip to main content
Compliant site power without building a board on site

Temporary Builders Supply Solutions

Getting safe, compliant power onto a construction site early is a recurring headache for builders and their Level 2 electricians. This page covers the temporary supply problem and the galvanised boxes — including a fully pre-wired option — that solve it fast.

The problem: safe power, day one

Sites need protected power before the permanent supply exists, and a non-compliant lash-up is a safety and inspection risk. Building a temporary board from parts on a muddy site eats a morning nobody has.

The products that fix it

Galvanised temporary supply boxes in 300x300 to 600x600, plus a fully pre-wired builders box with double GPOs, main switch, RCBO safety switch, SPD/MPD fuses, sub-board enclosure and neutral link — mount to the pole and connect.

How ordering works

Choose a bare box to fit out or the pre-wired unit ready to go, add pole-mount hardware, and we dispatch from Sydney so site power is sorted before the trades arrive.