Skip to main content
Guide · 2 October 2025 · 5 min read

How to Choose a Switchboard

A quick decision guide to specifying a switchboard — phase configuration, protection, enclosure and whether to order a pre-wired board.

Single or three phase?

Start with the supply. Single phase suits most homes and light commercial. Three phase is triggered by high-demand equipment — ducted air conditioning, EV chargers, pool heat pumps and workshops — and changes the main switch, service protection and metering pre-wire.

Get the protection schedule right

List the main switch rating and every protective device — RCBOs, MCBs and RCDs — with its rating. The schedule drives the busbar arrangement and the enclosure size, so a clear schedule means an accurate build.

  • —Main switch rated to the supply.
  • —RCBOs or RCD/MCB pairs on final circuits.
  • —Service protection — SPD or MPD — on a main switchboard.

Specify the enclosure

Choose the enclosure size, material and IP rating for the environment and the mounting method. Indoor clean positions suit powder-coated steel; exposed and coastal positions need higher IP ratings and stainless steel.

Consider a pre-wired board

A pre-wired board arrives assembled, labelled and tested — a mount-and-terminate job that removes the most common defects. EVO fabricates custom and pre-wired boards in Sydney; send your schedule with a quote request and we will build and test it before dispatch.

Frequently Asked Questions

When do I need a three-phase switchboard?

When high-demand equipment such as ducted air conditioning, EV chargers or workshop plant pushes maximum demand toward the limit of a single-phase supply. Three phase spreads the load and future-proofs the installation.

What information does a switchboard quote need?

The supply details, the main switch and protective device schedule with ratings, the metering requirements, and the enclosure size, material, IP rating and mounting method.

Is a pre-wired board better than building on site?

For most jobs, yes. It arrives assembled, labelled and tested, which removes common defects and turns board building into a mount-and-terminate job — especially valuable on volume housing.

Need Gear for the Job?

Our trade team quotes fast — usually within one business day.

Get a Quote