Skip to main content
Project · Estate rollout · 8 May 2026

Temporary Builders Supply Rollout — Campbelltown

A run of temporary builders supply boxes supplied for a staged residential estate, giving each lot compliant site power ready for the electrician to connect as construction rolled out.

Campbelltown, South-West Sydney 8 May 2026

What EVO Supplied

  • Temporary builders supply boxes with weatherproof enclosures
  • RCD-protected outlets and main switch
  • Metering provision for the temporary service
  • Mounting hardware suited to star pickets and temporary posts

The supply brief

A builder staging a residential estate release in Campbelltown needed temporary site power available lot by lot as each stage opened up. They wanted a consistent, compliant temporary supply box they could order in batches rather than chasing stock ad hoc. EVO supplied the boxes to a repeatable spec across the rollout.

What EVO supplied

We supplied weatherproof temporary builders supply boxes fitted with RCD-protected outlets, a main switch and metering provision. Keeping every unit to the same spec meant the site electrician knew what they were connecting every time, and replacements or additional lots could be supplied without re-specifying.

Connected by the site electrician

The builder's electrician positioned and connected each box to the temporary service as stages progressed. EVO supplied the equipment; all installation and connection was carried out by the customer's licensed trades.

Supplying a Similar Job?

Send us the details and our trade team will quote the gear — usually within one business day.

Request a Quote