Signs it's past its life
Meter boxes weather, corrode and fall out of step with a property's growing load. A few clear signs point to replacement.
- —Rust, corrosion or a failed door and hinges.
- —Water ingress or a box that no longer seals.
- —An old asbestos meter panel that needs safe removal.
- —A box too small for solar, EV or a switchboard upgrade.
- —Damage from impact, storms or age.
Asbestos panels need care
Older meter boxes may contain asbestos panels. These must be handled and removed by appropriately licensed people following the correct procedures — never disturbed or drilled. If you suspect asbestos, treat it accordingly before any work.
Replace as part of an upgrade
The most efficient time to replace a meter box is when the metering or switchboard is being upgraded anyway — for solar, EV charging or a phase upgrade. EVO supplies replacement meter boxes and metering to the trade; request a quote with the new metering layout.
Frequently Asked Questions
What are the signs a meter box needs replacing?
Rust or corrosion, a failed door or hinges, water ingress, an old asbestos panel, impact or storm damage, or a box too small for a solar, EV or switchboard upgrade.
My meter box might contain asbestos — what should I do?
Do not disturb or drill it. Older panels can contain asbestos and must be handled and removed by appropriately licensed people following the correct procedures.
When is the best time to replace a meter box?
When the metering or switchboard is being upgraded anyway — for solar, EV charging or a phase upgrade — so the box and the metering are done in one visit.
Related Products
Electrical Meter Boxes
Galvanised meter boxes from 300x300 to 600x900
Meter Box Solutions
Sort the metering enclosure before you're on site
Meter Boxes for Duplexes
Two-meter enclosures for side-by-side dwellings
Meter Boxes for Granny Flats
Compact metering for secondary dwellings
Meter Boxes
Galvanised steel meter boxes
Switchboards
Main switchboards & distribution boards
Meter Surrounds
Panels & surrounds for meter installations
Residential Construction
New builds, duplexes, granny flats and renovations
Electrical Contractors
Boards, boxes and metering at trade volume
Keep Reading
Solar Metering: What Changes at the Meter Box
Bidirectional metering, main switch requirements and panel space — what a solar installation needs at the metering position.
5 Meter Box Installation Mistakes That Cause Defects
Height, sealing, panel clearances, cable dressing and box selection — the recurring meter box defects and how to avoid each one.
The Complete Guide to Meter Boxes
Everything trade buyers need on meter boxes — sizing, materials, mounting, sealing, IP ratings and how to order the right enclosure the first time.